Trial Closure - Wilkin Road Wanaka

Share Trial Closure - Wilkin Road Wanaka on Facebook Share Trial Closure - Wilkin Road Wanaka on Twitter Share Trial Closure - Wilkin Road Wanaka on Linkedin Email Trial Closure - Wilkin Road Wanaka link

Consultation has concluded

Thanks to everyone who provided feedback on proposed improvements to the cycle network on Anderson Road and Aubrey Road in Wanaka.

We received over 120 submissions and lots of positive comments. We've published all of the feedback and responses from the project team - take a look at the document library on the right of this page.

Next Steps

Following the positive response, we will now start detailed design work on the project with a view to start construction soon. Part of this involves trialing the closure of Wilkin Road to make it safer for shared path users.

Wilkin Road Trial Closure details

  • The trial closure will run from 12.00pm Monday 18 November to 12.00pm Monday 25 November 2019.
  • Wilkin Road will be closed off at the intersection of Anderson Road using temporary traffic management. Appropriate signage and detours will be in place.
  • Pedestrian access will still be available between Wilkin Road and Anderson Road.
  • Traffic counters will be installed to monitor the traffic volumes during the trial closure.
  • For Wilkin Road residents between Anderson Road and Ragan Lane, rubbish collection will still occur on Friday. The rubbish truck will not be able to turn around at the closed end of Wilkin Road so we will have someone shift your bins down closer to Ragan Lane. Bins will be placed back outside your property by the end of the day. Please ensure your bins are outside your property prior to 7.00am on Friday.

Affected residents are invited to provide feedback on the proposed trial by 2 December 2019. Use the feedback form below.


About the cycle lane proposals:

The proposed projects will provide separate cycle and pedestrian lanes, making it much safer for people who choose to use active transport as their every-day way to travel.

We've provided some key details on each proposal below. You can also download the plans to view the full proposed route.

Proposed Anderson Road Cycleway

The proposed shared path is on the eastern side of Anderson Road and will link State Highway 84 (Wanaka-Luggate Highway) to Aubrey Road. Some key points about the proposed cycle lane include:

  • two lane, 3m wide shared cycle/pedestrian lane
  • asphalt surface
  • safe crossing points in appropriate locations
  • removal of some parking to improve safety
  • proposed to be completed in two stages

>> For full details, download the concept plan here


Proposed Aubrey Road Cycleway

The proposed shared path is on the northern side of Aubrey Road and will link to the proposed Anderson Road Cycleway and extend through to the Gunn Road roundabout. Some key points about the cycle lane include:

  • two lane, 3m wide shared cycle/pedestrian lane
  • asphalt surface
  • follows the existing gravel path
  • safe crossing points in appropriate locations to give pedestrians and cyclists priority at intersections
  • to be completed in four stages, with stage 1 proposed for completion this financial year (Anderson Road to Mount Ida Place)

>> For full details, download the concept plan here


Thanks to everyone who provided feedback on proposed improvements to the cycle network on Anderson Road and Aubrey Road in Wanaka.

We received over 120 submissions and lots of positive comments. We've published all of the feedback and responses from the project team - take a look at the document library on the right of this page.

Next Steps

Following the positive response, we will now start detailed design work on the project with a view to start construction soon. Part of this involves trialing the closure of Wilkin Road to make it safer for shared path users.

Wilkin Road Trial Closure details

  • The trial closure will run from 12.00pm Monday 18 November to 12.00pm Monday 25 November 2019.
  • Wilkin Road will be closed off at the intersection of Anderson Road using temporary traffic management. Appropriate signage and detours will be in place.
  • Pedestrian access will still be available between Wilkin Road and Anderson Road.
  • Traffic counters will be installed to monitor the traffic volumes during the trial closure.
  • For Wilkin Road residents between Anderson Road and Ragan Lane, rubbish collection will still occur on Friday. The rubbish truck will not be able to turn around at the closed end of Wilkin Road so we will have someone shift your bins down closer to Ragan Lane. Bins will be placed back outside your property by the end of the day. Please ensure your bins are outside your property prior to 7.00am on Friday.

Affected residents are invited to provide feedback on the proposed trial by 2 December 2019. Use the feedback form below.


About the cycle lane proposals:

The proposed projects will provide separate cycle and pedestrian lanes, making it much safer for people who choose to use active transport as their every-day way to travel.

We've provided some key details on each proposal below. You can also download the plans to view the full proposed route.

Proposed Anderson Road Cycleway

The proposed shared path is on the eastern side of Anderson Road and will link State Highway 84 (Wanaka-Luggate Highway) to Aubrey Road. Some key points about the proposed cycle lane include:

  • two lane, 3m wide shared cycle/pedestrian lane
  • asphalt surface
  • safe crossing points in appropriate locations
  • removal of some parking to improve safety
  • proposed to be completed in two stages

>> For full details, download the concept plan here


Proposed Aubrey Road Cycleway

The proposed shared path is on the northern side of Aubrey Road and will link to the proposed Anderson Road Cycleway and extend through to the Gunn Road roundabout. Some key points about the cycle lane include:

  • two lane, 3m wide shared cycle/pedestrian lane
  • asphalt surface
  • follows the existing gravel path
  • safe crossing points in appropriate locations to give pedestrians and cyclists priority at intersections
  • to be completed in four stages, with stage 1 proposed for completion this financial year (Anderson Road to Mount Ida Place)

>> For full details, download the concept plan here


  • Do you live on or near Wilkin Road in Wanaka?  Let us know your views on the trial closure happening between 18-25 November.   

    Consultation has concluded
    Share Wilkin Road Trial Closure on Facebook Share Wilkin Road Trial Closure on Twitter Share Wilkin Road Trial Closure on Linkedin Email Wilkin Road Trial Closure link
  • CLOSED: This survey has concluded. Check out the document library to read all the feedback and responses from the project team.

    Have your say on proposed improvements to the cycle network on Anderson Road and Aubrey Road in Wanaka. 

    Feedback closes on 19 September. 

    Consultation has concluded
    Share Cycle lane feedback form on Facebook Share Cycle lane feedback form on Twitter Share Cycle lane feedback form on Linkedin Email Cycle lane feedback form link